cerro-verde-5
Cerro Verde
Perú

Client

Sociedad Minera Cerro Verde SAA

Country

Perú

State

Arequipa

Related Experts

Hilda Garay
Head of supervision and CQA
Jesus Laor
Manager of Electromechanics
Johann Meléndez
Project manager
Romy Valdivia
Project Management Manager
Humberto Alvarado
Technical manager
Carlos César
Technical manager
Denys Parra
General Manager of Anddes Peru

Cerro Verde is an open-pit copper and molybdenum mining complex. The mine is located 30km from the city of Arequipa, at an altitude of 2,700 meters above sea level.

Anddes contributes to the success of the Cerro Verde project, through:

  • Tradeoff for the location of Pad 1 Phase 3.
  • Basic leaching pad engineering design, process pool and storage of surplus material.
  • Analysis of Pad Phase 3 Construction Alternatives 1.
  • Detailed Engineering of the Leaching Pad, Process Pool and Surplus Material Reservoir.
  • Foundation study of electrical substation, pumping station, high voltage towers.
  • Update of operation, geotechnical monitoring and contingency manuals for Pad 4B.
  • Study of alternatives for the repair of the current Pad 4B collection sump solution.
  • Detail engineering of the selected alternative.
  • Accelerographic record processing of the 4B leaching pad.
  • Update of the alert solution or threshold levels of the Pad 4B operations manual and determination of the Pad 4A mineral parameters.
  • Conceptual and basic engineering for the implementation of intermediate lines in Enlozada to ensure sand discharges in the intermediate slopes of the dam and ensure the growth of the dam.
  • Data processing and interpretation of the REF TEK accelerograph, model 130 s of the Pad 4B.
  • Technical assistance for the development of engineering and drawings in CAD tools, updating plans and integration for miscellaneous SMCV projects through the issuance of engineering deliverables.
  • Detail engineering of the Pad 1 Phase III Enhancement Project. Update of the physical stability in static, static and post-earthquake conditions of 9 sections of the Pad 4A.
  • Support for the procurement of metal mesh for the construction of the expansion of the Pad 1 Phase 3.
  • Basic engineering of the TL Jacking Header project.

Related experiences

1585576816Mde0KUGP
PLANTA DE BENEFICIO SAN NICOLÁS
Arcata2-internet (1)
Arcata
pampa-de-pongo-paisaje-aqp (1)
Pampa de Pongo
Eaton1 (1)
Eaton
tucari-1 (1)
Tucari
Arasi (1)
Arasi
Apumayo2 (1)
Apumayo
anama (1)
Anama
jesica4 (1)
Jesica
sanchez-cerro-paisaje-huancavelica-int
Sanchez Cerro
proinversión-1024x768 (1)
Pro Inversión
tambomayo-paisaje-aqp (1)
Tambomayo
Uchucchacua (1)
UCHUCCHACUA
shila1-
Shila
el-broncal2 (1) (1)
El Broncal
regina-puno-paisaje (1)
Regina
Arcata2-internet
ARCATA
mina-justa1-marcona-paisaje
Mina Justa
toromocho-1 (2)
Toromocho
san-gabriel
SAN GABRIEL
iscaycruz3
ISCAYCRUZ
Antapaccay1
ANTAPACCAY
toquepala
Toquepala
stonar-paisaje-de-moyobamba-int
STONAR
santa-rosa-4
Santa Rosa
cuajone3int (1)
Cuajone
la-merced1
La Merced
misha1
Misha
las-malvinas-2
Planta las Malvinas
inmaculada3
Inmaculada
up-cotonga1
Up Contonga y Pucarrajo - EN
la-granja3
La Granja
Atocongo_1-int-
Atocongo Y Pucara
yauliyacu3
Yauliyacu
Ariana5
Ariana
Condestable
Condestables
Proyecto-Ollachea
Ollachea
quiruvilca1
Quiruvilca
Constancia2
trapiche-5
Trapiche
san-rafael-1
San Rafael
san-juan-lima-paisaje
San Juan
crespo
Crespo
pachapaqui2
Pachapaqui
la-zanja-4
La Zanja
Huanzalá1-1024x765
Huanzalá
pierina-3 (1)
Pierina
Hilarión1-1024x768
Hilarión
morococha1
Morococha
Antamina3
Bateas