Anddes contributes to the success of the El Broncal project, through:
- Detailed engineering of the temporary stock in the Primary Crushing and OV3 area.
- Detailed engineering for the improvement of the tailings pumping system with current discharge line with 12 pipe.
- Feasibility engineering for the discharge of fine materials (current and future) and the discharge of tailings with expansion of plant capacity.
- Operation manual and operator training.